Ground conditions
The passage was left as loose, wind-blown sand over compacted fill, with scattered builder's debris — wrapping, offcuts, and construction litter — visible across the surface at handover. This was cleared before any base work began, and a continuous concrete kerb was cast along the length of the passage to form a proper edge restraint between the planted side and the walkway side, rather than relying on sand alone to hold the line.






